Roberts Construction

Organized for Performance - Commited to Service


Home :: Login
Main Site :: Album list :: Last uploads :: Last comments :: Most viewed :: Top rated :: My Favorites :: Search

Category Albums Files
Churches
3 26
Cumberland Church of Christ


Cumberland_Church-ext_1.JPG

Roberts Construction has worked with the church on three separate projects. In Phase I Roberts acted as construction manager to build an approximately 27,000 square foot 1100 seat sanctuary addition connecting to their existing facility. On Phase II Roberts provided design and construction management services for the renovation and reconfiguration of existing facility space into a new Youth Chapel, Sunday school classrooms, and offices and other ancillary space. Design services for Phase III have been provided which will include an expansion of the church’s existing Family Life Center and an expansion to educational spaces.

8 files, last one added on Dec 03, 2008

East Somerset Baptist Church


EXBC-int_8.JPG

This project includes the partial renovation of the existing facility and the construction of a 3,400 square foot addition including new kitchen facilities, bathrooms, offices and a large open multi-purpose area.

11 files, last one added on Dec 03, 2008

Redeemer Lutheran Church


Redeemer_int_5.jpg

This addition to the original building entails a sanctuary with seating for 450 people, a baptistery and a covered entry. The structure is a wood frame on a concrete slab with an asphalt shingle roof.

7 files, last one added on Dec 03, 2008

3 albums on 1 page(s)

Commercial
16 77
Aaron's of Richmond


Aaron_s,_Richmond-from_street.jpg

This 8,000 square foot facility was constructed under design-build contract. The retail center was constructed utilizing a pre-engineered metal building system on a concrete slab on grade with a metal wall panel and exterior insulated finish system façade.

3 files, last one added on Dec 03, 2008

Aaron's of London


175_2009_01_09_Finish_Photos_(4).jpg

This retail store consisted of an 8,000 square foot pre-engineered metal building in London, KY.

5 files, last one added on Jan 15, 2009

Backwaters


Backwaters-lot.JPG

This 8,000 square foot retail center was built on a concrete slab on grade utilizing a pre-engineered metal building for the primary structure. A standing seam metal roof and rustic log siding were used for the exterior finishes.

5 files, last one added on Dec 03, 2008

Dollar Generals - 9 sites IN, OH & KY


Fayetteville_DG.jpg

These nine approximately 8,000 square foot retail stores were built utilizing a pre-engineered metal building on a concrete slab on grade. Very aggressive time frames for construction were met in order to get the stores open for business.

3 files, last one added on Dec 03, 2008

Tiverton Plaza


179_Tiverton_9_9_2008_Before.JPG

This project involved the remodeling of an existing strip center in Lexington, KY. Included in the scope was the renovation of the exterior façade as well as the surrounding grounds.

7 files, last one added on Feb 17, 2009

Enterprise Office Center


Ent__Office_Ctr_-int.png

The Enterprise Center is a 20,000 square foot state of the art business center located in the Valley Oak Technology Complex in Somerset, Kentucky. The six suite facility provides a sophisticated telecommunications infrastructure designed to service the information technology and research and development industries. The facility was built in 2007 utilizing a concrete slab on grade, column and beam structural system, a membrane roof, and a brick and aluminum wall panel system veneer.

5 files, last one added on Dec 03, 2008

Lake Cumberland Cal Ripken ball park


Cal_Ripken_1.JPG

Roberts Construction acted as construction manager in the building of the Ward Correll Sports Complex. The project features four youth baseball fields with below grade dug outs, lawn sprinkler systems, and state of the art field lighting. The center of the complex has a two story concrete masonry concessions building which includes restrooms, concessions, storage and a second floor three hundred and sixty degree observation area as well as a covered shelter.

4 files, last one added on Dec 03, 2008

Aaron's [Danville, KY]


187_2009_11_06_Finish_Photos.jpg

This project is a 8,000 square feet retail sales and lease store. It is a pre-engineered metal building with front facade of E.I.F.S. Previous Aaron's stores have been completed in Richmond, Nicholasville, and London.

4 files, last one added on Nov 11, 2009

Mattingly Center


Mattingly_ext_3.JPG

This 12,000 square foot retail center was constructed utilizing a pre-engineered metal building system with a simulated stone and exterior insulated finish system façade. The project features an 8,000 square foot space for an Aaron’s Rents retail center as well as 4,000 square feet of future retail/office space.

4 files, last one added on Dec 03, 2008

Aaron's [Winchester, KY]


Completion_Photo_1-4-10.JPG

This project is a 8,000 square feet retail sales and lease store. It is a pre-engineered metal building with front facade of E.I.F.S. Previous Aaron's stores have been completed in Richmond, Nicholasville, and London.

3 files, last one added on Jan 06, 2010

Mill Springs Visitors Center


Mill_Springs-side.jpg

This project consisted of an approximately 9,500 square foot structure utilizing block with a brick veneer, and a poured concrete floor slab. The project features multiple exhibit rooms, a community room, a gift shop, multiple offices, and other ancillary space necessary to facilitate the operation of the museum.

11 files, last one added on Dec 03, 2008

Rite Aid - Jeffersonville, IN


Rite_Aid-landscaping.jpg

Roberts Construction completed this approximately 14,000 square foot retail project in the spring of 2008. The project was built utilizing a concrete slab on grade with a column and beam structural steel system. The exterior veneer included concrete masonry units, brick, and a variety of decorative wall panels and copings. The site required the installation of several hundred feet of retaining wall as extensive landscaping.

6 files, last one added on Dec 03, 2008

16 albums on 2 page(s) 1

Schools
13 51
Corbin Ind High


Corbin_HS_2.jpg

This project included the installation of a new elevator including a concrete block elevator shaft and machine room built in the interior atrium/cafeteria area of Corbin High School.

6 files, last one added on Dec 03, 2008

Laurel Co. Day Care


Laurel_Co_Day_Care_2.JPG

This approximately 5,000 square foot day care facility was built in the London-Laurel County Industrial Park. The wood frame with brick veneer building features class rooms and other ancillary spaces for a full service day care facility.

3 files, last one added on Dec 03, 2008

Meece Middle


2008_10_21_MMS_2.JPG

This project featured the updating of existing electrical systems along with data and telecommunications rough ins for a facility technology upgrade.

5 files, last one added on Dec 03, 2008

Nancy Elem. (2 proj)


Nancy_2.JPG

Roberts Construction has built a 5,000 square foot four classroom addition as well as a 6,000 square foot addition for a new entrance and administrative office complex at Nancy Elementary. Both projects utilized geothermal heating and cooling systems and building components to match the existing building.

4 files, last one added on Dec 03, 2008

Northern & Southern Middle


NMS_2.JPG

This project featured the addition of a cooling tower and major heating and cooling modifications and updates to provide air conditioning to the gymnasiums and other associated ancillary spaces. The project also required renovation to the interior finishes of the schools’ music wings.

5 files, last one added on Dec 03, 2008

Northern Middle (3 proj)


Northern_3.JPG

– Roberts Construction was pleased to be selected as an emergency action to perform extensive renovation and corrective work to the North wing of the school that was struck by a tornado.
- Roberts has also done a two story six classroom addition project as well as the addition of a cooling tower and major heating and cooling modifications and updates to provide air conditioning to the gymnasium and other associated ancillary spaces.

3 files, last one added on Dec 03, 2008

Oak Hill Elem


Oak_Hill_3.jpg

This project was a 6,500 square foot six classroom addition to the existing facility. This project utilized geothermal heating and cooling systems and building components to match the existing building.

3 files, last one added on Dec 03, 2008

Pulaski Co. High


PCHS_2.JPG

One project at Pulaski High School was the construction of a structural concrete grandstand at the football complex. The project features fixed bleacher seating and stadium seating for approximately 800 people.
- The second project at the high school was an emergency structural and masonry veneer repair to the cafeteria.

6 files, last one added on Dec 03, 2008

Salem Elem


Salem2.jpg

3 files, last one added on Dec 03, 2008

Somerset Comm. College (4 proj)


SCC_2.JPG

[Cosmetology Renovation] This approximately 2,500 square foot project consisted of the renovation of existing campus space for the implementation of the space to be utilized for training the students in the field of cosmetology.
-[Stoner Hall Elevator] The project consisted of the removal of an existing elevator and the installation of a larger capacity elevator as well as structural and mechanical required for the new elevator.
-[Entrance and Parking Expansion] This project consisted of grading work and paving for a new 100 space parking lot as well as new walks and reconfiguration of the main entrance to the Somerset Campus.
-[Restroom/Entry Renovation] This approximately 1,500 square foot renovation project consisted of converting existing space into two new restrooms, a break room, and a new entry way.

4 files, last one added on Dec 03, 2008

Somerset High (3 proj)


SHS_2.jpg

Roberts Construction completed this approximately 20,000 square foot project consisting of the extensive demolition and renovation to the portion of the school built in 1963. The project included all new interior finishes as well as new heating and cooling systems and window and door replacement.
- Roberts also performed a refurbishing to the Somerset High School baseball facility. The scope of work included extensive structural and mechanical renovation to the stadium and the construction of a new concessions area, restrooms and a press box.

2 files, last one added on Dec 03, 2008

West Jessamine High (2 proj)


WJHS_1.JPG

This gymnasium renovation consisted of the demolition of an existing stage area for reconfiguration as well as the installation of new telescoping bleachers and refurbishing of fixed seating in the gymnasium.
- Roberts also renovated the approximately 30,000 square foot portion of the school built in 1959, consisting of extensive demolition.

3 files, last one added on Dec 03, 2008

13 albums on 2 page(s) 1

Industrial
9 31
Dal-R's


Dal-Rs_3.JPG

This project consisted of approximately 16,000 square feet and was constructed utilizing a pre-engineered metal building on a poured concrete floor slab. The project featured some 4,000 square feet of show room/sales area and offices as well as approximately 12,000 square feet of warehouse space to service the needs of this retail client.

3 files, last one added on Dec 03, 2008

London Joint Operations Facility


LJOF_completed_photo.JPG

This approximately 10,000 square foot facility utilized a pre-engineered metal building structure with a standing seam metal roof with a brick veneer and metal wall panel façade. The facility will serve as a base of operations with administrative offices, supply facilities, a helicopter pad, and parking and vehicle storage areas for the facility.

7 files, last one added on Jan 15, 2009

McCreary Spec


Areial_photo_of_McCreary_Co__Speculative_Building.jpg

This project consists of the construction of site development of approximately ten acres with the entire necessary utility infrastructure as well as the construction of an approximately 32,500 square foot pre-engineered metal building with a split face block wainscot and metal wall panel veneer.

2 files, last one added on Dec 03, 2008

Multi Model


Multi_Modal_#3.gif

This project consisted of three separate buildings, which included an Administrative building, a 78,750 square foot Warehouse and Distribution building, and a Truck Scale and Truck Wash building. This project was contracted with South Kentucky Economic Development Authority.

3 files, last one added on Dec 03, 2008

SKIDA Spec - Corbin


SKIDA_3.JPG

This project consists of the construction of an approximately 53,000 square foot pre-engineered metal building with a split face block wainscot and metal wall panel veneer speculative building. This was built as a speculative building for SKIDA and is now occupied by Pepsi-Cola.

5 files, last one added on Dec 03, 2008

Somerset Recycling


Somerset_Recycle_1.JPG

This total project consisted of three buildings totaling approximately 60,000 square feet. Roberts Construction arranged for the architectural design of the main building which consisted of a 56,000 square foot pre-engineered metal building on a concrete slab. This contract included the total electrical system for the recycling equipment and lighting. Interior finishes for the office space were also included in the design and construction of the project.

2 files, last one added on Dec 03, 2008

Somerset Social Security


Somerset_SS_2.JPG

This approximately 11,000 square foot building was built on a concrete slab on grade utilizing a pre-engineered metal building frame and standing seam roof with a brick and simulated stucco veneer.

3 files, last one added on Dec 03, 2008

Valley Oak IT Exp


2008_10_21_IT_exp.JPG

The Valley Oak IT Expansion project consisted of doubling the facility’s expansive technology room. The high security technology building required increasing the specialty cooling system as well as modifications to the electrical and security systems.

2 files, last one added on Dec 03, 2008

London Joint Ops - Phase II


DSCF1334.jpg

This project is the construction of new 6400 square foot additions to an existing office facility as well as a new 9911 square foot maintenance building for the National Guard Joint Support Operations. This is phase 2 of a 3 phase project.

4 files, last one added on Oct 02, 2009

9 albums on 1 page(s)

Assisted Living/Multi Family
7 35
Corbin Friendship House


Corbin_int__3.JPG

This approximately 30,000 square foot assisted living facility was built on Christian Care Communities’ Corbin, Kentucky campus. The three story 52 unit wood frame with brick veneer project featured amenities such as a renovated dining room, facility meeting room, and an elevator installation.

6 files, last one added on Dec 03, 2008

Emerald House


Emerald_ext__1.JPG

Roberts Construction provided construction services for this approximately 12,000 square foot 12 unit addition to an existing assisted living facility. The addition included 12 new resident units. Other amenities included in the new addition: a renovated dining hall, a lounge, resident laundry, and a beauty salon.

6 files, last one added on Dec 03, 2008

Grayson Friendship House


Grayson_1.JPG

Roberts Construction built this 43,623 square foot assisted living facility for Christian Care Communities in 2002. The 52 unit three story facility was built utilizing a concrete slab on grade, wood framing, and a brick veneer. This project was recognized by the Kentucky Housing Corporation and HUD as the “2003 Best New Elderly Property” for the state of Kentucky.

6 files, last one added on Dec 03, 2008

Inez Apartments


Inez_3.JPG

3 files, last one added on Dec 03, 2008

Lincoln County Duplexes


Duplex__Front.jpg

3 files, last one added on Dec 03, 2008

Taylorsville Friendship House


Taylorsville_7.jpg

This 23,500 square foot assisted living facility was built on Christian Care Communities’ Taylorsville, Kentucky campus. The three story 42 unit wood frame with brick veneer project featured amenities such as a campus dining room, facility meeting room, a reading room and laundry room as well as an expansion outdoor living patio area.

8 files, last one added on Dec 03, 2008

The Highlands


Highlands_ext__2.JPG

Roberts Construction provided construction management and architectural design & administration services for this 16 unit addition to an existing assisted living facility. The addition includes 10 new studio units and 6 one bedroom suites. Other amenities included in the new addition: a four-season porch, lounge, resident laundry, wellness room, marketing office, activities office, and a large lounge that connects the existing facility with the new.

3 files, last one added on Dec 03, 2008

 

 

7 albums on 1 page(s)

Pre-Engineered
10 42
Aaron's of Richmond


Aaron_s,_Richmond-front.jpg

This 8,000 square foot facility was constructed under design-build contract. The retail center was constructed utilizing a pre-engineered metal building system on a concrete slab on grade with a metal wall panel and exterior insulated finish system façade.

3 files, last one added on Dec 03, 2008

Backwaters


Backwaters-front.JPG

This 8,000 square foot retail center was built on a concrete slab on grade utilizing a pre-engineered metal building for the primary structure. A standing seam metal roof and rustic log siding were used for the exterior finishes.

5 files, last one added on Dec 03, 2008

Dal-R's


Dal-R_s_1.JPG

This project of approximately 16,000 square feet was constructed utilizing a pre-engineered metal building on a poured concrete floor slab. The project featured some 4,000 square feet of show room and offices and approximately 12,000 feet of warehouse space to service the needs of this retail client.

3 files, last one added on Dec 03, 2008

Dollar Generals - 9 sites IN, OH & KY


Fayetteville_DG.jpg

These nine approximately 8,000 square foot retail stores were built utilizing a pre-engineered metal building on a concrete slab on grade. Very aggressive time frames for construction were met in order to get the stores open for business.

3 files, last one added on Dec 03, 2008

East Somerset Baptist Church


ESBC-int_7.JPG

Roberts Construction has worked with the church on three separate projects. In Phase I Roberts acted as construction manager to build an approximately 27,000 square foot 1100 seat sanctuary addition connecting to their existing facility. On Phase II Roberts provided design and construction management services for the renovation and reconfiguration of existing facility space into a new Youth Chapel, Sunday school classrooms, and offices and other ancillary space. Design services for Phase III have been provided which will include an expansion of the church’s existing Family Life Center and an expansion to educational spaces.

10 files, last one added on Dec 03, 2008

Independent Opportunities


Ind__Opp__1.jpg

This approximately 10,000 square foot adult day care facility utilized a pre-engineered metal building structure with a standing seam metal roof with a simulated stucco and stone veneer façade. The facility features interior and exterior patient care spaces as well as administrative office and other ancillary space for the operation of the facility.

4 files, last one added on Dec 03, 2008

Mattingly Center


Mattingly_ext_3.JPG

This 12,000 square foot retail center was constructed utilizing a pre-engineered metal building system with a simulated stone and exterior insulated finish system façade. The project features an 8,000 square foot space for an Aaron’s Rents retail center as well as 4,000 square feet of future retail/office space.

4 files, last one added on Dec 03, 2008

McCreary Spec


Areial_photo_of_McCreary_Co__Speculative_Building.jpg

This project consists of the construction of site development of approximately ten acres with the entire necessary utility infrastructure as well as the construction of an approximately 32,500 square foot pre-engineered metal building with a split face block wainscot and metal wall panel veneer.

2 files, last one added on Dec 03, 2008

Somerset Recycling


Somerset_Recycle_1.JPG

This total project consisted of three buildings totaling approximately 60,000 square feet. Roberts Construction arranged for the architectural design of the main building which consisted of a 56,000 square feet pre-engineered metal building on a concrete slab. This contract included the total electrical system for the recycling equipment and lighting. Interior finishes for the office space were also included in the design and construction of the project.

2 files, last one added on Dec 03, 2008

KY Regional High Growth


174_2009_03_03_[2].JPG

This 26,250 square foot pre-engineered metal building with 46 foot walls is located in Somerset, KY and used as a lineman training facility.

6 files, last one added on Mar 04, 2009

 

 

10 albums on 1 page(s)

Renovation
9 48
Citizens National Banks (3 branches)


Inside_Burnside_Branch_at_Citzens.JPG

5 files, last one added on Dec 03, 2008

Clark County Health Dept


Clark_HD_int__1.jpg

This project consisted of the addition of 3,600 square feet of new space and the renovation of 9,000 square feet of existing space to the client’s Winchester, Kentucky facility. The addition was built to match the existing facility while the renovated space included all new interior finishes as well as new lighting and heating and cooling systems.

7 files, last one added on Dec 03, 2008

Corbin Campus


Corbin_Garden_Homes.JPG

This 23,500 square foot assisted living facility was built on Christian Care Communities’ Taylorsville, Kentucky campus. The three story 42 unit wood frame with brick veneer project featured amenities such as a campus dining room, facility meeting room, a reading room and laundry room as well as an expansion outdoor living patio area.

6 files, last one added on Dec 03, 2008

Eye Deal Eye Care - London


2008_10_23_Eye_Deal_4.JPG

This project encompassed the relocation of this professional services office into a newly renovated 3,000 square foot space. The project featured extensive casework refurbishment as well as all new interior finishes and lighting.

6 files, last one added on Dec 03, 2008

Pulaski County Health Dept


2008_10_20_PCHD_3.JPG

This project consisted of the addition of 3,100 square feet of new space and the renovation of 2,500 square feet of existing space to the client’s Somerset, Kentucky facility. The addition was built to match the existing facility while the renovated space included all new interior finishes, new restrooms, and modifications to the heating and cooling systems.

3 files, last one added on Dec 03, 2008

Realm - Life Scan


2008_10_21_Life_Scan_4.JPG

This specialty renovation to existing space required structural reinforcing and specialty cooling being added for a computed tomography (CAT scan) unit installation. Office and ancillary space for the unit were also required.

4 files, last one added on Dec 03, 2008

Sunrise Manor


2008_10_20_Sunrise_Manor_3.JPG

This renovation to an existing nursing home facility involved the conversion of existing space into 4 additional resident rooms as well as modifications to entrances and office spaces.

4 files, last one added on Dec 03, 2008

Taylorsville Friendship House


Taylorsville_8.jpg

This 23,500 square foot assisted living facility was built on Christian Care Communities’ Taylorsville, Kentucky campus. The three story 42 unit wood frame with brick veneer project featured amenities such as a campus dining room, facility meeting room, a reading room and laundry room as well as an expansion outdoor living patio area.

8 files, last one added on Dec 03, 2008

Outdoor Venture


185_2009_11_06_Finish_Photos.jpg

This project consisted of renovating the mechanical and electrical portion of an existing factory in Stearns, Kentucky that makes tents for the military. The building received upgraded electrical and HVAC plus reworking the existing front office and break room area.

5 files, last one added on Nov 11, 2009

9 albums on 1 page(s)

Current Projects
2 10
Construct Cemetery NE-Phase I


Site_03-23-10_002.jpg

This project is to construct a new Veteran’s cemetery in Grayson, Kentucky of Greenup County. The cemetery will contain standard burial plots, crypts, columbaria, irrigation systems, roadways, and turf establishment. Also included in this project is an Administration Building, committal shelter and Maintenance Facility. The ground breaking ceremony for the new cemetery is to take place on Friday, September 18, 2009.

5 files, last one added on Mar 26, 2010

Corbin Utilities Commission Renovation [Bldg 1]


2010_03_17_pictures.jpg

This project consists of the renovation of an existing 1-story, 26,000 square foot facility and enclosure of an existing 4,000 square foot covered patio (formerly a car dealership) to contain utility / management offices, maintenance offices, maintenance service bays, support spaces, and parts / equipment storage. Site improvements include, but are not limited to, earthwork, asphalt paving and poured concrete sidewalks. Located on 18th Street in Corbin, KY, this facility will house the immediate area’s utility service supplier by year’s end.

5 files, last one added on Mar 24, 2010

 

2 albums on 1 page(s)

320 files in 69 albums and 8 categories with 0 comments viewed 3656 times